>
fabrication period
1970
employment
Cover
maximum span
7-10-14m
class of reinforcement
Single line wire
weight of the piece [kg/ml]
180
comments
This is a piece that was patented as prestressed and built as post-tensioned, which explains some of its peculiarities. It has a double dowel (2 meters long) and a system of single line post-tensioning of the freyssinet class. The problems of the resting of the pieces over the girder are solved like in the prestressed pieces. The post-tensioning wedges aren’t on sight, rather being hidden with mortar.









