fabrication period
1967-1971
employment
Shelter
maximum span
8m
class of reinforcement
Wire
weight of the dowel [kg/ml]
80
weight of the resting piece [kg/ml]
120
comments
As opposed to the cedex shelter, were the anchorings were on plain sight at the vortex of the pieces, in this case the trajectory of the cables is modified in the extreme piece of the corbel so that we may place the wedges inside the section.generally they are fastened onto the reinforced concrete wall, were some bolts have been previously placed so as to permit the pass of the poststressed wires.the necessary dowels are aligned and the whole piece is tensed from the extreme of the corbel.