>
fabrication period
1960-1963
employment
Cover
maximum span
22m
class of reinforcement
Twisted Cable
weight of the piece [kg/ml]
350
comments
The calculation of the section was made without the superior parasol, as is shown in the schema section (and yet the dowel properties correspond to the totallity of the section) the parabolic trajectories of the cables correspond to the sets of two and three drills while the remainder are straight (of late is has been replaced by a prestressed replica).
|
||||||||||
CEDEX PIECE
¬ technichal data¬ Centre of Hydrographic Studies. Madrid Project for the Spanish Pavillion in the World Fair. New York CEDEX DUCK PIECE¬ |
||||||||||
|
|









